Port Of Taranto: San Cataldo Container Terminal Yilport
San Cataldo Container Terminal (SCCT), the concessionaire for the areas and quay of Taranto’s Multi-purpose Pier, has begun redevelopment and regulatory compliance activities to enable the operation of the existing infrastructure and facilities.
To this end, it has defined detailed technical specifications for the operationalization of the structures and has entrusted SJS, as General Contractor, with the design and execution of routine maintenance work on the following buildings:
- Section 1: ‘Termporay Gate Building’;
- Section 2: ‘Building 1 (Ground Floor and Roof)’; Section 3: ‘Building 1 (First Floor)’;
- Section 4: ‘Workshop (part of it)’;
- Section 5: ‘Building 2 (Ground Floor only)’;
- Section 6: ‘Place Station’.
The project’s planned activities include:
- routine building maintenance, excluding structural work;
- functionality checks on existing technological systems; and repair, integration, and replacement of system components to integrate or maintain the efficiency of existing technological systems.
During construction, surveys were conducted using UAV equipment. The SJS UAV pilot holds a license issued by ENAC in accordance with European EASA regulations and is authorized to conduct overflights in the presence of people, over urban residential areas, and over sensitive infrastructure (highways, power plants, railway lines, etc.).
The construction work was carried out by S.J.S. BUILDINGS s.r.l.